Disassembly of Darwind D115 5MW

In September of 2019 we deconstructed a Darwind D115 5MW in the Dutch town of Wieringerwerf.

  • Disassembly
  • The Netherlands
  • 2019
  • Darwind D115 5MW

Together we can achieve more

We are F&B Group

We always stand shoulder to shoulder with our employers, willing to share our knowledge and take steps to make sure that a wind turbine’s efficiency and availability are the best they can be.

Read more